LayItLow.com Lowrider Forums banner
1 - 8 of 8 Posts

·
Registered
Joined
·
10,888 Posts
Discussion Starter · #1 ·
i am juicing the 79 monte going to run 8 batts and 3 or 4 pumps...........


wrapping and molding the lower arms.........


extending,wrapping, and chaining the uppers.......reinforcing.........the axle.........the rear humps........the belly.........

putting in a chain bridge...........



does anyone have a list of the metals and lengths they used i can't seem to find mine right now..........


if someone has a list that would be good otherwise i need to make my own real soon today i have to get the order in fast so i get the steel on time :(


thnaks for any help............
 

·
Registered
Joined
·
1,549 Posts
1 4X8 SHEET OF 3/16
1 4X8 SHEET OF 1/4
50" OF 7" WIDE 1/4" THICK C-CHANNEL FOR REAR BRIDGE
4' 2X2X1/4" THICK BOX TUBING FOR CHAIN MOUNTS
START WITH 20' OF 2X2X1/4" ANGLE IRON FOR BATTERY RACK


THIS SHOULD GET YA GOIN.
 

·
True-S Mike
Joined
·
251 Posts
Originally posted by PISTONPUMP-1@Aug 27 2005, 10:15 AM~3702620
1 4X8 SHEET OF 3/16
1 4X8 SHEET OF 1/4
50" OF 7" WIDE 1/4" THICK C-CHANNEL FOR REAR BRIDGE
4' 2X2X1/4" THICK BOX TUBING FOR CHAIN MOUNTS
START WITH 20' OF 2X2X1/4" ANGLE IRON FOR BATTERY RACK
THIS SHOULD GET YA GOIN.
daaaaaaaaaamn 20' of angle iron?


you stockin up
 

·
Registered
Joined
·
638 Posts
Hey switchcraft if you reinforce the frame with the body on then you will be sorry later, just wait until you can take the body off trust me on this.
 
1 - 8 of 8 Posts
This is an older thread, you may not receive a response, and could be reviving an old thread. Please consider creating a new thread.
Top